The administration area and principal’s office should be closer to the main entry. The first floor exterior doors need to be replaced and/or refinished.
Several of the existing classrooms could be better utilized for current uses: Rooms 110, 208, 113, 115, 313, 260 and the computer room could be divided into 2-3 smaller rooms.
The gym windows and blinds need to be replaced.
The gym storage area should be redesigned to improve the function.
Outdoor PE storage space is needed.
A second Gym / Multipurpose room for the middle school would have significant impact on scheduling. This could be used for PE, performance, dancing, and a second cafeteria.
A second cafeteria would allow for more students to be served simultaneously.
The kitchen appliances need to be updated and replaced. Many have not been serviced in some time.
The acoustics can be untenable in the kitchen’s serving area and in the cafeteria
In general, many of the finishes are at the end of their life cycle—corridor carpeting, classroom carpeting, wall coverings, stair treads, rubber base, and landing finishes. New paint at all walls and handrails.
The boiler room roof is at the end of its life cycle and should be replaced.
Locker rooms are underutilized because of poor configuration.
Staff could use a more comfortable place to convene. The personal wellness room/fitness room is a good resource but a shower would make it more useful.
The lower parking lot should be paved, and a gate should be added (for maintenance/security reasons).
The baseball field needs to be upgraded and should be reconfigured to regulation size.
The Maintenance Garage overhead door should be enlarged and replaced to allow for a 9’-6’ snowplow.
Vehicular and pedestrian flow and solutions during drop off and pick up should be explored in more detail.
The old basketball court is not used and could be repurposed.
The furniture is outdated and some is being replaced this summer. AV Room may be underutilized and outdated.
The administration area and principal’s office should be closer to the main entry. The first floor exterior doors need to be replaced and/or refinished.
Several of the existing classrooms could be better utilized for current uses: Rooms 110, 208, 113, 115, 313, 260 and the computer room could be divided into 2-3 smaller rooms.
The gym windows and blinds need to be replaced.
The gym storage area should be redesigned to improve the function.
Outdoor PE storage space is needed.
A second Gym / Multipurpose room for the middle school would have significant impact on scheduling. This could be used for PE, performance, dancing, and a second cafeteria.
A second cafeteria would allow for more students to be served simultaneously.
The kitchen appliances need to be updated and replaced. Many have not been serviced in some time.
The acoustics can be untenable in the kitchen’s serving area and in the cafeteria
In general, many of the finishes are at the end of their life cycle—corridor carpeting, classroom carpeting, wall coverings, stair treads, rubber base, and landing finishes. New paint at all walls and handrails.
The boiler room roof is at the end of its life cycle and should be replaced.
Locker rooms are underutilized because of poor configuration.
Staff could use a more comfortable place to convene. The personal wellness room/fitness room is a good resource but a shower would make it more useful.
The lower parking lot should be paved, and a gate should be added (for maintenance/security reasons).
The baseball field needs to be upgraded and should be reconfigured to regulation size.
The Maintenance Garage overhead door should be enlarged and replaced to allow for a 9’-6’ snowplow.
Vehicular and pedestrian flow and solutions during drop off and pick up should be explored in more detail.
The old basketball court is not used and could be repurposed.
The furniture is outdated and some is being replaced this summer. AV Room may be underutilized and outdated.
01. EXTERIOR: New Pavilion; exterior classroom.
Options put forth to generate discussion about how to address Program Needs and Building / Systems Needs. We need your input!
More Design Options Coming Soon!
Options put forth to generate discussion about how to address Program Needs and Building / Systems Needs. We need your input!
LYNDON TOWN SCHOOL (SITE PLAN)
LYNDON TOWN SCHOOL
(FLOOR PLAN - LEVEL 1)
LYNDON TOWN SCHOOL
(FLOOR PLAN - LEVEL 2)
LYNDON TOWN SCHOOL
(FLOOR PLAN - LEVEL 3)
LYNDON TOWN SCHOOL
(BUILDING & SYSTEMS SUMMARY)
Paved switchback trail.
New generator; Plow for tractor; Boiler repair/replacement; Wood chip / Pellet controls.
Promethean Boards (Instructional displays).
Cat 6 wiring.
New dishwasher; Replacement of Walk-in Refrigerator Unit.
Paved switchback trail.
New generator; Plow for tractor; Boiler repair/replacement; Wood chip / Pellet controls.
Promethean Boards (Instructional displays).
Cat 6 wiring.
New dishwasher; Replacement of Walk-in Refrigerator Unit.
The Kingdom East School District board members, administration, along with members of gbA Architecture, will lead community discussions regarding facilities needs as well as short and long term plans for the Lyndon Town School and KESD as a whole.
The goal of this event is to discuss the facilities needs and priorities of the Lyndon Town School and share results from the surveys.
This is an opportunity for your voice to be heard, and for you to help determine the best plan for your school and district.
Where: Lyndon Town School (or online via ZOOM)
2591 Lily Pond Rd, Lyndonville
When: Wednesday, May 24th at 6:30pm
Once the community input from our local meetings in May is incorporated into the planning, we will host a second meeting to review findings and priorities for each school in the district and get feedback from you. Please note that this meeting will occur in person with an option to join via Zoom
(a link will be sent out in advance).
Where: TBD
Event Location Information Coming Soon
When: TBD
More Information Coming Soon
The Kingdom East School District board members, administration, along with members of gbA Architecture, will lead community discussions regarding facilities needs as well as short and long term plans for the Lyndon Town School and KESD as a whole.
The goal of this event is to discuss the facilities needs and priorities of the Lyndon Town School and share results from the surveys.
This is an opportunity for your voice to be heard, and for you to help determine the best plan for your school and district.
Where: Lyndon Town School (or online via ZOOM)
2591 Lily Pond Rd, Lyndonville
When: Wednesday, May 24th at 6:30pm
Once the community input from our local meetings in May is incorporated into the planning, we will host a second meeting to review findings and priorities for each school in the district and get feedback from you. Please note that this meeting will occur in person with an option to join via Zoom
(a link will be sent out in advance).
Where: TBD
Event Location Information Coming Soon
When: TBD
More Information Coming Soon)
The Kingdom East School District board members, administration, along with members of gbA Architecture, will lead community discussions regarding facilities needs as well as short and long term plans for the Lyndon Town School and KESD as a whole.
The goal of this event is to discuss the facilities needs and priorities of the Lyndon Town School and share results from the surveys.
This is an opportunity for your voice to be heard, and for you to help determine the best plan for your school and district.
Where: Lyndon Town School (or online via ZOOM)
2591 Lily Pond Rd, Lyndonville
When: Wednesday, May 24th at 6:30pm
Once the community input from our local meetings in May is incorporated into the planning, we will host a second meeting to review findings and priorities for each school in the district and get feedback from you. Please note that this meeting will occur in person with an option to join via Zoom
(a link will be sent out in advance).
Where: TBD
Event Location Information Coming Soon
When: TBD
More Information Coming Soon)
SHARE YOUR INPUT!
Please take this short survey about your community’s school: its structure, indoor spaces, & outdoor spaces.
What are your ideas to improve spaces? Your input will help determine the greatest areas of need for facilities improvements. A brainstorm of all stakeholders, and hearing from as many of you as possible, will help shape a plan that best meets the school community needs.
SHARE YOUR INPUT!
Please take this short survey about your community’s school: its structure, indoor spaces, & outdoor spaces.
What are your ideas to improve spaces? Your input will help determine the greatest areas of need for facilities improvements. A brainstorm of all stakeholders, and hearing from as many of you as possible, will help shape a plan that best meets the school community needs.
SHARE YOUR INPUT!
Please take this short survey about your community’s school: its structure, indoor spaces, & outdoor spaces.
What are your ideas to improve spaces? Your input will help determine the greatest areas of need for facilities improvements. A brainstorm of all stakeholders, and hearing from as many of you as possible, will help shape a plan that best meets the school community needs.
Butler's Bus Service is in desperate need of bus drivers for the 2023-2024 school year!
They are currently offering a SIGN ON BONUS to all that apply & complete our PAID training program to obtain a CDL, Class B License w/ passenger & School Bus endorsement. NO Experience Needed!
- Applicants applying fully licensed w/ a valid CDL Class B and School Bus Certificate $2,000 sign on bonus!
- Applicants w/ a non CDL license $1,500 sign on bonus!
Call Darlene at 802-626-4712 to learn more, or to apply!
64 Campus Lane
Lyndon Center, VT 05850
Phone: (802) 626-6100
Fax: (802) 626-3423
Butler's Bus Service is in desperate need of bus drivers for the 2023-2024 school year!
They are currently offering a SIGN ON BONUS to all that apply & complete our PAID training program to obtain a CDL, Class B License w/ passenger & School Bus endorsement. NO Experience Needed!
- Applicants applying fully licensed w/ a valid CDL Class B and School Bus Certificate $2,000 sign on bonus!
- Applicants w/ a non CDL license $1,500 sign on bonus!
Call Darlene at 802-626-4712 to learn more, or to apply!